Limestone Contamination Test provided by Overland Park

KCMMB Test No. 1
Procedure for Analysis of Non-specified
Aggregate within Freshly Mixed Concrete

Part A

  1. Obtain 25-30 lb. sample of freshly mixed concrete in accordance with ASTM C172.
  2. Wash obtained sample of freshly mixed concrete over combination of 12" diameter ½ -inch and 3/8- inch sieves in general accordance with ASTM C117.
  3. Weigh wet aggregate.
  4. Remove non-specified aggregate and other deleterious materials in general accordance with ASTM C142.
  5. Weigh remaining specified aggregate.
  6. Percentage of non-specified aggregate is: 1 - (Specified aggregate weight/Total aggregate weight)

If percentage of non-specified aggregate in concrete mixes delivered from centrally batched concrete plants exceeds 3% by weight of the coarse aggregate fraction, or if percentage of non-specified aggregate in all other concrete mixes exceeds 2% by weight, place specified and non-specified aggregate in separate sample bays and return to the laboratory and complete Part B of the test.

Part B

  1. Place specified and non-specified aggregate in separate sample bays.
  2. Dry both aggregates in general accordance with ASTM C566.
  3. Determine dry weight of specified and non-specified aggregates.
  4. Final percentage of non-specified aggregate is: 1 - (Dry weight of specified aggregate/Dry weight of total aggregate)